Traditional Project - how to set date parameters

I need to keep a new Project I just created a Traditional Project (we anticipate DNA results and the fields are needed) but I would like to set date parameters. I can see that someone else has done this in the past but can’t figure out where those settings might exist. Can someone help?

I know this is possible with a collection project. But I don’t see the option in Traditional either.

1 Like

But in a traditional project members add their observations manually, so why do you need to set the date? Just write - maybe in bold - in the project description to please only add observations of the range of dates you require.

I was hoping to have the best of both worlds. Looking back on a project our club did in the past I can see that in 2022 it appears this feature was in the traditional project.

1 Like